• Our Contact:
  • +44-7939-1846-76
  • info@umezcng.com
  • |
  • Mon - Sat: 9am to 6pm

HOW IT WORKS

Awesome Image

How We Work

  • Stage 1

    Assessment and Planning:

    Vehicle Evaluation: Assess the vehicle’s condition, engine compatibility, and suitability for CNG conversion.
    System Design: Plan the CNG system layout, including the selection of components such as tanks, injectors, and regulators.
  • Stage 2

    Component Installation:

    CNG Tank Installation: Install the CNG tank securely in the vehicle, usually in the trunk or underbody.
    Fuel Line Setup: Fit the fuel lines from the CNG tank to the engine, ensuring proper routing and safety.
    Injector and Regulator Installation: Install CNG injectors and pressure regulators in the engine bay for precise fuel delivery.
  • Stage 3

    System Integration:

    Electronic Control Unit (ECU): Integrate the CNG ECU with the vehicle’s existing electronic system to manage fuel switching and optimize performance.
    Calibration: Adjust the ECU settings for optimal fuel-air mixture and engine performance.
  • Stage 4

    Testing and Adjustment:

    System Testing: Conduct thorough testing of the CNG system for leaks, proper operation, and safety compliance.
    Performance Adjustment: Fine-tune the system to ensure smooth operation and efficient performance.
  • Stage 5

    Certification and Documentation:

    Regulatory Compliance: Obtain necessary certifications and approvals from relevant authorities to ensure the conversion meets safety and emission standards.
    Documentation: Provide the vehicle owner with detailed documentation of the conversion process, including maintenance guidelines.
  • Stage 6

    Customer Orientation:

    User Training: Educate the vehicle owner on operating the CNG system, including refueling procedures and safety practices.
    Support: Offer ongoing support and maintenance services to address any issues or concerns post-conversion.